| Sl. No. |
Client Name & Address |
Job Description |
Year of Completion |
1. |
NTPC Limited
Anta Gas Power Station,
P.O. Anta, Baran (Raj.)
|
Increasing the Stack Height of Waste Heat Recovery Boilers |
2011 |
2. |
Century Paper and Pulp Ltd., Ghanshyamdham, P.O. Lalkua – 262402, Distt, Nainital, Uttrakhand |
Fabrication and Erection of CLO2 Plant, |
2011 |
3. |
Bharat Petroleum Corp. Ltd. A- 5&6, Sector-1, Noida-201301 |
Provision of Cross Over/ Catwalk at Tank Farm at Bina Dispatch Terminal. |
2010 |
4. |
Aditya Birla Nuvo Limited,
Hi- Tech Carbon, Patalganga Project, Patalganga, Raigad, (Maharashtra)
|
Supply, Erection and Commissioning of Fire Fighting System. |
2010 |
5. |
Jindal Poly Films Limited
Nasik |
Fabrication /Erection of Piping in CS/SS, 1800 tons of Equipment Erection, Structural Steel work etc. for & PETF
|
2010 |
6. |
Polyplex Corporation Limited
B-37, Sector-1, Noida -201301, Gautam Budh Nagar, (U.P.)
|
Machine Installations, Manpower Supply, Steel Structure Work, Piping Work & Miscellaneous Fabrication including chimney, tanks etc. |
2010 |
7. |
Nirma Limited, Bhavnagar
|
Design, supply, installation of complete Fire Hydrant System for Caustic Plant. |
2009 |
8. |
Indian Oil Corporation Ltd.,
A-1, Udyog Marg, Sector-1,
Noida -201301
|
Laying of 8” water Pipeline for fire water at PHCPL, Paradip |
2009 |
9. |
SRF Limited
Sector -3, SEZ, Pithampur, Dist. Dhar, M.P. – 454775
|
Fabrication & Erection of SS Silo Film line project at SEZ, Indore along with piping in SS/CS and equipment erection about 1500 tons. |
2009 |
10. |
Essar Constructions (India) Limited, Khambhalia, Jamnagar
|
Fabrication of Structural Steel for Hazira Works ( 4500 tons of Yard fabrication) |
2009 |
11. |
Philips Carbon Black Ltd;
Mundra, Gujarat
|
Fabrication /erection of Piping in CS/SS along with supporting, valves etc. |
2009 |
12. |
The Indure Pvt. Ltd.,
New Delhi |
Structural Steel Fabrication /Erection For Power Plant’s Ash Handling System Over 1500 Tons at Haryana Vidyut, Yamunanagar. |
2009 |
13. |
Jindal Polyfilms Ltd.
Nasik |
Fabrication of Storage Tanks, Erection of 300 Tons of Equipments, Insulation, Piping etc. for Metallizer and BOPP Project. Mechanical Job Work (3500 Tons of Equipments.) |
2009 |
14. |
Engineers India Ltd.,
C/o Panipat Refinery, Naptha Cracker Project, Panipat
|
Underground Piping upto 42“Ø with U.G. Protection, Cement Lining, Civil work etc. for OWS System of NAPTHA CRACKER Project of Panipat Refinery. |
2009 |
15. |
Vacmet Packings Pvt. Ltd;
Mathura.
|
Fabrication/Erection of 36 meter high Structural Tower for Dryer. |
2009 |
16. |
JCT Ltd.,
Phagwara, Punjab
|
Supply & Erection of Bunker Structure for the Boiler of 8 MW Turbine, DM Water Tank in SS 304 along with Civil, Electrical work and Supply & Erection of Alloy Steel/ Carbons Steel Piping for HP Steam of Boiler and Turbine and its Cooling Water Circuit. |
2008 |